Customization: | Available |
---|---|
After-sales Service: | 5 Year |
Warranty: | 3 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This machine is mainly suitable for filling, pressing plug and capping all kinds of small dose liquid, such as essential oil, eye drops, injection, etc. Widely used in food, pharmaceutical, chemical industry and scientific research fields. The machine adopts advanced peristaltic pump or 316L stainless steel and ceramic plunger pump for filling, the filling precision is up to 99% above,the whole machine includes transmission parts, filling parts, stoppering parts, unscramble plug,unscramble cap parts, screwing (rolling) cap parts, etc. The whole machine has compact structure, reasonable design, stable operation and long service life. It can be used independently or become a linkage production line.
Applicable specification | 2-250ML |
Production speed | Single head:30-50(b/m) Double head:60-80(b/m) |
Stoppering and cap pass rate | >99% |
Filling error | ±1~2% |
Power supply | 380/220,2.5KW |
Purify compressed air pressure and air consumption | 0.6-0.8MPa,10-30m3/h |
Wenzhou Kxite Machinery Technology Co., Ltd. was established in 2010.As a manufacturer of packing machines serving the world, we always put quality innovation first, from R&D design, parts procurement, assembly production, quality inspection and evaluation, sales to after-sales and other systems, to truly meet customer needs
Precise sales, think what you think
By inspecting the global paper bag production status, comprehensively considering the suggestions of printing and packaging industry veterans, according to the actual needs of different customers, we design and produce a variety of configuration models, allowing customers to choose flexibly.
Excellent R&D management
We have an excellent R&D design team and excellent management talents in the packaging industry. We fully understand the actual needs of the packaging industry, ensuring that every piece of equipment we manufacture can be affirmed by customers and create greater benefits.
After-sale guarantee
Provide customers with comprehensive and timely after-sales service and a sense of service in the end.
Blister packing machine | Tube Filling Sealing Machine | labeling machine | cartoning machine |
Stationery packing machine | ointment Filling Sealing Machine | sticker labeling machine | Stationery cartoning machine |
Pharmaceutical packing machine | cream jellies Filling Sealing Machine | bound bottle labeling machine | Pharmaceutical cartoning machine |
Food packing machine | toothpaste Filling Sealing Machine | shrink sleeve labeling machine | Food cartoning machine |
Daily necessities packing machine | lotion Filling Sealing Machine | adhesive labeling machine | Daily necessities cartoning machine |
Fragile items packing machine | cosmetics Filling Sealing Machine | hotmelt glue labeling machine | Fragile items cartoning machine |
Auto parts packing machine | medicine Filling Sealing Machine | bound bottle labeling machine | Auto parts cartoning machine |
Tissue paper packing machine | Plastic Tube Filling Sealing Machine | packing box labeling machine | Tissue paper cartoning machine |
pen packing machine | aluminum tube Filling Sealing Machine | paper box labeling machine | pen cartoning machine |
oral liquid packing machine | bearings Blister packing machine | cosmetics packing machine | oral liquid cartoning machine |
toothpaste packing machine | napkin cartoning machine | cosmetics cartoning machine | toothpaste cartoning machine |
Order requirement:
How much speed do you need?
What tubes do you want to fill? Plastic tube? Aluminium tube? Laminated tube?
What size of the tube? Diameter? Length?
How much capacity do you want to fill?
What is your raw material?
Do you need chiller if it is plastic tube?
What is the voltage? Is it 380V 50hz 3phase?
When do you need ?
ur service:
1 we can design the machine according to your requirement and we can design the process according to your technology process
2 we manufacture the machine according to GMP standard, all the machine welding will be tested by X ray testing.
3 we will pack the machine by film and then pack it by wooden box, load the machine to container by special engineer
4 engineer will install the machine according to your production room and design, test the machine
5 we will provide online service if you have any questions, you can send email and call us or send message by skype will give you suggestion
6 we can supply you parts in the future
Pre-sales issues
How to answer technical guidance?
For some customers who need non-standard equipment, we will communicate with the company's relevant technical personnel according to the customer's specific requirements, taking into account the technical feasibility and production costs, and give customers solutions.
How to recommend products?
We can also provide non-standard equipment production and new product development services according to customer requirements. According to the customer's picture of the paper bag to be produced, the purpose of the product to be purchased, the environment, the purchase volume and other related conditions, we will recommend several cost-effective products for the customer to choose.
How to make a quotation?
Based on our company's research and development costs, production costs and customer purchases, we conduct calculations to determine the price of the product.
Problems in sale
About payment
After signing the contract, 30% of the total payment will be paid in advance, and the factory will accept the payment and pay the full amount of the machine for delivery.
About delivery time
About 90 working days after receiving the deposit (non-standard machine), the factory will re-decide whether to change the delivery date when the order is confirmed. The standard machine is generally within 60 working days after receiving the deposit.
Order tracking
After the customer places an order, our company will send professional personnel to track the order and regularly report the production progress to the customer. Customers can check the order status on the official website (delivery query).
Product testing
During the production process, our company will adopt strict inspection process to ensure product quality. Through internal inspection, we ensure that the components produced by our company meet the technical requirements; through external inspection, we ensure that the components produced by our company are not subject to quality problems; and then pass the whole machine inspection to ensure that the mechanical equipment meets the technical production requirements .
Product packaging
Before the product is shipped, it will be packed in a strict vacuum plus bottom tray (wooden tray or steel tray)
Product Transportation
Products are generally shipped from Ningbo Port, China to the destination port by sea.
After sales question
Shelf life/warranty period of the product
The product warranty period is generally one year, and our company provides lifetime maintenance services. If the machine has quality problems, our company will help the customer to solve it through the following ways: a. Send spare parts to the customer. b. Remotely assist customers in maintenance. c. Notify our agent company to send personnel to the customer's factory for maintenance. d. Our company directly dispatches relevant personnel to the customer's factory for maintenance.
About transportation damage
In the process of product transportation, if product damage occurs, it is determined that our product packaging and reinforcement work is not in place, and our company will bear the corresponding losses.
About machine maintenance
We will contact customers on a regular basis on how to maintain and maintain the machine. For domestic customers, we will have a master to provide on-site service.
Problems during use
If there is any problem in the process of using the product, the customer can directly call or send an email to our after-sales department (24-hour hotline). The personnel of our department will respond immediately and make a decision on the response measures within 24 hours.